Sunday, February 14, 2016

Another quick update

We got the wires run for the second electric element for the Aqua-Hot, a little challenging finding and then making a lighted switch work.  And it still doesn't work exactly as I had hoped.  I wanted it to light anytime we turned on the second element as to remind us that we had it on, but unfortunately the way the circuit works, there is only power through the switch, allowing it to light, when the element is on, but way better than nothing.  Also we can report the second element works very well down to around 45 degrees which we've been having bit too often for our tastes here in Florida:)

There was a bit of a snafu with our windshield repair.  Seems the communication between the installer and inspector here in Florida broke down to the original installer in Colorado so we lost about 3 weeks.  Now the process is working through, but the windshield had to be ordered so we are expecting another maybe 3 weeks until we have the new one installed.  Oh well, we aren't going anywhere right now anyway.

Jan almost got picked for jury duty, came down to the wire, but ultimately she was let go to come home.  Could have been several days.  

No comments: