Monday, November 3, 2014

Tile is gone!

Jan and I worked all day long to get the rest of the tile out.  It is amazing that it is so difficult.  We could barely move at the end of the day.  We also removed our new desk/cabinet and bookshelves.  Then we collapsed into comas:-)

A good start

Almost done

The little shards under the trim work were
quite a challenge!
We have both decided that neither of us wants to get a job removing porcelain tile no matter what it pays.  How it can stick the way it does, and then of course it shatters into razor sharp shards when you try to pry it up.  Just that small area, perhaps 32 square feet took all day!  And we are still hobbling around today, but it's all gone and the good stuff is coming.  We did have one bad find though, seems we have a small water leak around the driver's side window.  We will patch it now and pull it out and recaulk later.  Always something, right?
Bert says, "Why are you disrupting my home?"
So we are loosening up and awaiting Ernie's arrival at 8am.  He said he will remove our slide out carpet, measure, cut the new carpet, put in a seam, and send us off with the new carpet to have it bound on the border that goes on the edge of the slide out.  Then the bedroom gets demo done, as he will start laying the wood there first.  Yippee!

Sunday, November 2, 2014

Here we go!

We met Ernie bright and early and headed into Fort Worth, at least I think it was Fort Worth, we drove for a long time and went to a Lumber Liquidators.  Jan picked out a beautiful cyprus and a beautiful hickory.  Really couldn't decide between the two, but the decision was made for us, no cyprus in stock, but plenty of hickory.  So we loaded up the truck with our wood, then had to drive another 20 minutes or so to get to another Lumber Liquidator that had the T-molding we needed.  Only glitch in the plan was no one had the stair nose so it is on a fast track order from their warehouse in NY, and being sent directly to Ernie.
A couple pics of our new wood
One of our goals is to lighten up the interior of our coach, so as you can see the wood is light.  Since we lived with the color of the plywood all summer long, we felt that it was really effective brightening things up.

After a quick lunch stop we went to find some carpet.  We are using carpet on our front driver's side slide out, and a little here and there in the bedroom.  We found a really nice piece that fit the bill and had the added benefit of being a big remnant which saves some bucks:-)

So now that we have our material, that leaves the demo, which Jan and I are going to help with.  Ernie takes Sunday off, so after finding out exactly what he needs, we are going to tackle the rest of the tile floor.  We are not looking forward to it, if you remember our travails with the rest of it, but that's our chore today, and hopefully we can get it out and remove our new desk/cabinet, and a few other things and be ready to start fresh with Ernie tomorrow.  We already took the captain's chairs out.
No chairs and the last of the tile to come out

I have a feeling the mess is just beginning
More updates tomorrow if Jan and I can still move around:-)